Project:
River Front Walkway
City: Manchester
Contractor: Eastern Iowa Excavating and Concrete, LLC
Field Completion: May 11, 2009
Construction Cost: $118,805.24
Project Description: Eight foot wide concrete walkway along the north side of the Maquoketa River from the existing walkway under the Marion Street Bridge to the north side of the Main Street Bridge
Before Construction
Before Construction
After Construction
Before Construction
After Construction
Before Construction
After Construction
|